FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS FUND)
2021-2024 : Project Leader, Energy Management and Power Quality Monitoring Framework for Smart Building Using IoT. Budget approved RM 121,000.
2015-2017 : Project Member, Optimal Time of Use(TOU) electricity Pricing for future smart grid application in Malaysia. Budget approved RM58,500.
2015-2017 : Project Member, Performance study on active power filter (APF) utilizing asymmetric multilevel inverters. Budget approved RM 102,700.
2012-2014 : Project Leader, An Experimental Study of Harmonics Impact on Step-Down Transformer in End User Equipment. Budget approved RM 84,040
2007-2009 : Project Member, Harmonic Losses Estimation and Modelling in Power Distribution System.
2007-2009 : Project Member, Optimal Monitoring and Automatic Analysis of Voltage Sags for Power System Distribution Network.
CONTRACT RESEARCH PROJECT AWARDED
1. Project Leader, International Grant Solar Powered and IoT Integrated Sustainable Hydroponic System for B40 Community at Overcrowded Flat. (2022-2023)
2. Project Member, Pembangunan Sistem Tenaga Solar PV di Kampung Orang Asli Terakhir Tanpa Bekalan Berterusan Di Johor: Tewowoh, Mersing (2021-2022).
3. Project Member, Projek Aplikasi Sistem Tenaga Elektrik Solar Pv Bagi Kampung Nelayan Atas Air di Tanjung Surat, Johor (2021-2022).
4. Project Member Development of the User-Friendly Power Quality Analysis Software (2015-2016), Researcher.
OTHERS RESEARCH PROJECT UNDERTAKEN
2023 - 2025 : Project Leader, Solar Powered Data Driven Hydroponic System with Energy Monitoring for Urban Farming. Budget
Approved RM40,000.
2023 – 2025 : Project Member UTMSPC 2.15: Vertical Farming: An Innovative Approach to Sustainable Food Production in Urban
Landscape. Budget Approved RM20,000.
2022 – 2023 : Project Leader, UTM-KTP RIG 2022, Pembangunan Pintar Hidroponik Menggunakan Teknologi IoT (Internet of Things). Budget approved RM 20,000.
2021 - 2026 : Project Member, Research Contract For UTM-LIPI Collaborative Research – Based Postgraduate Program. Budget approved RM 1,002,774
2021 - 2023 : Project Member, Pengembangan E-Lab Merdeka Berbasis IoT-Cloud untuk Praktik Edukits 4.0 Jarak Jauh. Budget approved
RM 28,757
2021-2023 : Project Member, Pengembangan E-Lab Merdeka Berbasis IoT-Cloud untuk Praktik Edukits 4.0 Jarak Jauh. Budget approved RM 28,561.93
2018 - 2021 : Project Leader, UTM-TRG 3.1 Power Quality Monitoring and Analysis of UTM Distribution System. Budget approved RM 158, 200.
2018 – 2021 : Project Member, UTM-TRG 3.6 Auditing Processes for Energy Consumption and Savings For UTM JB Campus -
Cluster Approach. Budget approved RM 94,000.
2018 – 2021 : Project Member, Development of A Baseline Green Building Index For Low Carbon Society (Case Study of Iskandar
Development Region, IDR). Budget approved RM 50,000.
2017-2019 : Project Leader, Flagship Grant: An Early Detection of Distribution Transformer Failure Due to Harmonics. Budget approved RM 50,000.
2017-2019 : Project Leader, GUP-Tier 1: Improved Control Strategy for a Grid-Feeding Power Converter in An Islanded Microgrid. Budget approved RM 40,000
2017-2019 : Project Member, GUP-Tier 1: Integration of Time of Use (TOU) Tariff in Net Energy Metering (NEM) Scheme for Electricity Customers. Budget approved RM 40,000
2015-2017 : Project Leader, GUP-Tier 1: Comprehensive Monitoring and Diagnostic System for Power Distribution Substation. Budget approved RM 49,990
2015-2017 : Project Member, GUP-Tier 1: An Experimental Study on Weight Measurement of Moving Vehicle Using Acoustic Emission Technique. Budget approved RM 50,000
2014-2015 : Project Member, GUP-Tier 2: Optimal Monitoring of Voltage Sags in Power System Network. Budget approved RM 31,992.60
2014-2015 : Project Member, GUP-Tier 1: Regulation of System Frequency Using Synchro phasors under High Penetration of Wind Energy in Smart Grids. Budget approved RM 20,000
2014-2015 : Project Member, GUP-Tier 2: Optimal Monitoring of Voltage Sags in Power System Network. Budget approved RM 31,992.60
2012-2014 : Project Leader, GUP-Tier 1: A New Customized Voltage
Sag Generator (VSG) Using Tablet-Pc Interface for Portable Electrical Equipment Testing. Budget approved RM 160,789
2012-2014 : Project Member, GUP-Tier 1: Constant Slip Control of Wind
Turbine Induction Generator at Low Wind Velocity. Budget approved RM 160,789
2012-2013 : Project Leader, GUP-Tier 2: On-Line Power Transformer Monitoring System for Regular Maintenance and Early
Warning of Failure and Losses. Budget approved RM 20,000
2011-2013 : Project Member, GUP-Tier 1: Unbalanced Three Phase Harmonics Power Flow. Budget approved RM 150,000
2010-2011 : Project Member, GTIM Grant: Harmonic Measurement and Analysis on Industrial Load. Budget approved RM 20,000
2007-2009 : Project Member, E-Science Fund. Security Constrained and Loss Minimized Electrical Power System Operation.