Research

RESEARCH ACTIVITIES

FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS FUND)

 

2021-2024                        :       Project Leader, Energy Management and Power Quality Monitoring Framework for Smart Building Using IoT. Budget approved RM 121,000.

 

2015-2017                        :       Project Member, Optimal Time of Use(TOU) electricity Pricing for future smart grid application in Malaysia. Budget approved RM58,500.

 

2015-2017                        :       Project Member, Performance study on active power filter (APF) utilizing asymmetric multilevel inverters. Budget approved RM 102,700.

 

2012-2014                        :       Project Leader, An Experimental Study of Harmonics Impact on Step-Down Transformer in End User Equipment. Budget approved RM   84,040

 

2007-2009                        :       Project Member, Harmonic Losses Estimation and Modelling in Power Distribution System.

 

2007-2009                        :       Project Member, Optimal Monitoring and Automatic Analysis of Voltage Sags for Power System Distribution Network.

 

CONTRACT RESEARCH PROJECT AWARDED

1.    Project Leader, International Grant Solar Powered and IoT Integrated Sustainable Hydroponic System for B40 Community at Overcrowded Flat. (2022-2023)

 

2.    Project Member, Pembangunan Sistem Tenaga Solar PV di Kampung Orang Asli Terakhir Tanpa Bekalan Berterusan Di Johor: Tewowoh, Mersing (2021-2022).

 

3.    Project Member, Projek Aplikasi Sistem Tenaga Elektrik Solar Pv Bagi Kampung Nelayan Atas Air di Tanjung Surat, Johor (2021-2022).

 

4.    Project Member Development of the User-Friendly Power Quality Analysis Software (2015-2016), Researcher.

 

OTHERS RESEARCH PROJECT UNDERTAKEN

 

  2023 - 2025                         :     Project Leader, Solar Powered Data Driven Hydroponic System with Energy Monitoring for Urban Farming. Budget 

                                                       Approved RM40,000.

 

  2023 – 2025                        :     Project Member UTMSPC 2.15: Vertical Farming: An Innovative Approach to Sustainable Food Production in Urban

                                        Landscape. Budget Approved RM20,000.

     

  2022 – 2023               :         Project Leader, UTM-KTP RIG 2022, Pembangunan Pintar Hidroponik Menggunakan Teknologi IoT (Internet of   Things). Budget                  approved RM 20,000.

 

  2021 - 2026                     :         Project Member,  Research  Contract  For  UTM-LIPI Collaborative Research – Based Postgraduate Program.   Budget approved RM         1,002,774

 

  2021 - 2023                           :         Project Member, Pengembangan E-Lab Merdeka Berbasis IoT-Cloud untuk Praktik Edukits 4.0 Jarak Jauh. Budget approved 

RM 28,757

 

2021-2023                             :             Project Member, Pengembangan E-Lab Merdeka Berbasis IoT-Cloud untuk Praktik Edukits 4.0 Jarak Jauh. Budget approved RM       28,561.93

 

2018 - 2021                           :               Project Leader, UTM-TRG 3.1 Power Quality Monitoring and Analysis of UTM Distribution System. Budget approved RM 158, 200.

 

 2018 – 2021                       :       Project Member, UTM-TRG 3.6 Auditing Processes for  Energy Consumption and Savings For UTM JB Campus -  

                                                         Cluster Approach. Budget approved RM 94,000.

 

2018 – 2021                           :                Project Member, Development of A Baseline Green Building  Index For Low Carbon Society (Case Study of Iskandar  

                                                       Development Region, IDR). Budget approved RM 50,000. 

 

2017-2019                              :               Project Leader, Flagship Grant: An Early Detection of Distribution Transformer Failure Due to Harmonics. Budget approved RM 50,000.

 

2017-2019                         :       Project Leader, GUP-Tier 1: Improved Control Strategy for a Grid-Feeding Power Converter in An Islanded Microgrid. Budget approved RM 40,000

 

2017-2019                         :       Project Member, GUP-Tier 1: Integration of Time of Use (TOU) Tariff in Net Energy Metering (NEM) Scheme for Electricity Customers. Budget approved RM 40,000 

 

2015-2017                         :       Project Leader, GUP-Tier 1: Comprehensive Monitoring and Diagnostic   System for   Power   Distribution   Substation. Budget  approved RM 49,990

 

2015-2017                         :       Project Member, GUP-Tier 1: An Experimental Study on Weight Measurement of Moving Vehicle Using Acoustic Emission Technique.  Budget approved RM 50,000

 

2014-2015                         :       Project Member, GUP-Tier 2: Optimal Monitoring of Voltage Sags in Power System Network. Budget approved RM 31,992.60

 

2014-2015                         :       Project Member, GUP-Tier 1: Regulation   of   System Frequency Using Synchro phasors under High Penetration of Wind  Energy in Smart Grids. Budget approved RM 20,000

 

2014-2015                         :       Project Member, GUP-Tier 2: Optimal Monitoring of Voltage Sags in Power System Network. Budget approved RM 31,992.60

 

2012-2014                         :       Project Leader, GUP-Tier 1: A New Customized Voltage

     Sag Generator (VSG) Using Tablet-Pc Interface for Portable Electrical Equipment Testing. Budget approved RM 160,789

 

2012-2014                         :       Project Member, GUP-Tier 1: Constant Slip Control of Wind

     Turbine Induction Generator at Low Wind Velocity. Budget approved RM 160,789

 

 2012-2013                                :         Project Leader, GUP-Tier 2: On-Line Power Transformer Monitoring System for Regular Maintenance and Early

                                                          Warning of Failure and Losses. Budget approved RM  20,000

 

2011-2013                               :       Project Member, GUP-Tier 1: Unbalanced Three Phase Harmonics Power Flow. Budget approved RM 150,000

 

2010-2011                         :       Project Member, GTIM Grant: Harmonic Measurement and Analysis on Industrial Load. Budget approved RM 20,000

 

2007-2009                         :       Project Member, E-Science Fund. Security Constrained and Loss Minimized Electrical Power System Operation.